Siemens presents the new version of his platform D3 of aerogeneradores in Barcelona
14 March 2014
In the annual European event for the industry,
Under the lemma 'Watts up!', Siemens presents the new aerogenerador of 3,2 megavatios for terrestrial wind parks that, depending of the place of installation, can obtain an annual performance 3,5% elder that his previous model.
Likewise, Siemens has created a Centre of Experts in his stand of 200 square metres that will have brief presentations about the engineering of wind turbines, technology of storage of power and the importance of the electrical systems for an efficient transmission.
During the fair Siemens, like co-sponsor of the fair and together with European Wind Power Association (Ewea), have realizar the exhibition 'Wind Challenge'. An interactive exhibition in which the visitors can experience the feeling of how generates the power from the wind by means of a simulator that measures the flow and power of the air.
The wind power form splits of the portfolio environingingmental of the sector Power of Siemens. Around 43% of the income of the company are generated by the products and sustainable solutions. What does of Siemens one of the main world-wide providers of technology that bet by the environingingment.
Siemens this present in the fair Ewea, in the pavilion 7 Stand 7D10.