FY29 - FuturEnergy

Eficiencia Energética: Centros Educativos, Culturales y Deportivos | Energy Efficiency: Educational, Cultural & Sports Centres www.futurenergyweb.es 82 FuturEnergy | Abril April 2016 de el acumulador de inercia, funcionando como un circuito independiente. Las obras se realizaron entre enero y marzo de 2015, funcionando la piscina desde el 1 de abril de 2015 con la energía suministrada por la caldera de biomasa. Además, durante la parada de verano se sustituyó la climatizadora por una nueva deshumectadora Astral Pool, de diseño especial con ventiladores de caudal variable de hasta 36.000 m3/h, 65,6 l/h de deshumectación y batería de calentamiento con energía externa de 327 kW. La instalación se controla mediante siete autómatas conectados a un SCADA, recogiendo datos de: caldera, climatizadora, contadores, bombas, válvulas y sondas. Primeros resultados La licitación se adjudicó manteniendo los costes de mantenimiento preventivo y rebajando en 33.000 €/año los costes de energía térmica de la piscina, asumiendo además el contratista los costes de energía eléctrica de la instalación, los de mantenimiento correctivo y el consumo térmico del polideportivo. El coste de energía quedó fijado para el Ayuntamiento en 84.915 €/año. Hay que tener en cuenta que el coste de la inversión, unos 410.000 €, fue superior al presupuestado en la licitación, por lo que el canon de energía debe compensar una parte de la inversión. En los once primeros meses de funcionamiento se ha conseguido una mejora muy considerable en el confort térmico manteniéndose los parámetros adecuados en todas las variables consideradas. La producción de energía térmica útil en primario de caldera durante estos meses ha sido de 1.018 MWh, lo que hace prever un consumo final anual de 1.200 MWh, repartiéndose el consumo: 306 MWh vaso grande, 126 MWh vaso pequeño, 50 MWh producción de ACS, 15,5 MWh calefacción de vestuarios y 42,6 MWh polideportivo. Las pérdidas de distribución se han estimado en torno al 3%. Este consumo es aproximadamente un 20% superior al estimado en la licitación, debido al mayor confort térmico y al consumo del polideportivo. El suministro de combustible se ha realizado desde la planta de astillado de Exver en Cáceres, obteniéndose una astilla de alta calidad que ha permitido el funcionamiento en continuo del sistema sin incidencias. El consumo de energía eléctrica de sala de calderas es aproximadamente el 1,6% de la energía térmica producida. El consumo de las dos bombas de impulsión ha sido de 5.010 kWh en 6.372 horas de funcionamiento alterno. El consumo eléctrico de la nueva climatizadora ha sido de 18.580 kWh para un consumo térmico en la batería de calentamiento externo de 327 MWh. Es por tanto el 5,68% del consumo térmico. El diseño de la impulsión a caudal variable con un único grupo de impulsión reduce el número de bombas prestando perfectamente el servicio. El control mediante válvulas de dos vías proporcionales, permite un ahorro eléctrico significativo en bombas y un control preciso. Se obtienen ahorros significativos de consumo eléctrico ajustando ligeramente los caudales de aire dentro de valores no sensibles por el usuario. connection to the sports centre. The sports centre is directly connected from the buffer tank and works as an independent circuit. The works took place between January and March 2015, with the swimming pool starting operation on 1 April 2015 using the energy supplied by the biomass boiler. Moreover, during the summer stoppage period, the air conditioner was replaced with a new Astral Pool dehumidifier, especially designed with variable flow ventilators of up to 36,000 m3/h with a 65.6 l/h dehumidification capacity and an externally powered 327 kW heating unit. The installation is controlled through seven automatons connected to a SCADA, collating data from the boiler, air conditioner, meters, pumps, valves and probes. Initial results The contract has maintained preventive maintenance costs at their existing level, however has reduced the heating costs of the swimming pool by €33,000 per year. The contractor assumed the electrical power costs of the installation plus the costs corresponding to corrective maintenance and the heat consumption of the sports centre. The cost of energy for the City Hall remains set at €84,915 per year. It should be remembered that the total investment, some €410,000, was higher than that forecast in the tender which means that the energy fee should offset part of the investment. A substantial improvement has been achieved over the first eleven months of operation in levels of thermal comfort, maintaining the appropriate parameters for all the variables in question. Useful energy production from the primary boiler during these months was 1,018 MWh, with an estimated final annual consumption of 1,200 MWh, distributed as follows: 306 MWh for the large pool, 126 MWh for the small pool, 50 MWh for DHW production, 15.5 MWh for heating the changing rooms and 42.6 MWh for the sports centre. Losses from distribution are estimated at around 3%. This consumption is approximately 20% higher than the tender estimate, due to the increased thermal comfort and consumption of the sports centre. The fuel is supplied from the Exver wood chip plant in Cáceres, procuring high quality wood chip which allows the system to operate on a continuous basis without incident. Electricity consumption by the boiler room is approximately 1.6% of the thermal energy produced. The two discharge pumps consumed 5,010 kWh over 6,372 alternating operating hours. The electric consumption of the air conditioner was 18,580 kWh for a thermal consumption by external heating unit of 327 MWh, representing 5.68% of the thermal consumption. The variable flow discharge design with a single discharge unit has reduced the number of pumps required to provide a perfect level of service. The use of two balancing valves has resulted in a significant saving in electricity used by the pumps in addition to accurate control. Considerable savings have been obtained in electricity consumption by slightly adjusting air flows within the range of values that have no impact on the user. Caldera de biomasa | Biomass boiler Eva Jiménez Rodríguez & Gerardo González Cantos Ayuntamiento de Toledo | Toledo City Council Pedro Antonio Ramos López, FCC Industrial Ignacio Macicior Tellechea, FORESA

RkJQdWJsaXNoZXIy Njg1MjYx