The company has 10 years of experience and is specialized in offering comprehensive facilities of inductive loops/loops performing the integral installation: cut the pavement and install the cable cover slot with hot asphalt mastic.
It is equipped with own and specific tools for cutting Groove (diamond calibrated to perform an optimum depth of cut), and the filling with bituminous mastic hot (gas boiler casting bituminous mastic 180 °).
Also offers complementary services of civil engineering: masonry, painting, construction of islets, etc.