New automatic logistical centre for Greiner Bio One
16 May 2012
![Imagen](https://img.interempresas.net/fotos/626085.jpeg)
was contemplating The construction of a logistical centre automated since with the replanificación of the warehouse automated could achieve a rotation of stocks higher and an expedition of commodity faster. Focusing this vision, the Group Greiner took the decision of allanar the way for the future regarding logistics together with SSI Schaefer like general contractor.
Of producer of cork to company multinational in the sector of synthetic material
All began to finals of the 19th century with a small production of cork. Today the Group Greiner with his headquarters in Kremsmünster (Alta Austria) is an important multinational in the sector of plastics. The company, with a network of production and distribution in more than 100 countries of the world and some 1700 employees, is having a spectacular success in both sectors.
Finishing in record time
In only a year of term of construction finished the new logistical centre. With SSI Schaefer in quality of general contractor built in a surface of more than 4.000 metres squared a logistical centre that consists of a warehouse of big height and of the zones of reception and expedition of commodity. The zone of ‘picking' is situated in the high plant. The already existent warehouse uses now for the supply of material of both productions.
The logistical centre
The warehouse of big height of SSI Sshaefer consists of 4 corridors with a warehouse of palés of double depth. With more than 5.000 locations and a weight of 500 kg by palé, Greiner Bio One has of sufficient capacities to be prepared for the future. The four transelevadores of the four corridors of the warehouse of big height have of telescopic forks. Each transelevador is installed in such a way that it can work in double cycles. It means that whereas it stores a unit of transport, desalmacena another unit of transport to the turn.
The palés of products finished that go arriving of the sterilisation wrap automatically and go through the control of sobrepeso. A car of distribution commissions of the distribution of palés to the corridors of individual warehouse.
![Imagen](https://img.interempresas.net/fotos/626086.jpeg)
The process of ‘picking' - commodity to man - Pick by Light
The process of ‘picking' carries out in the high plant of the logistical centre. Applying the procedure ‘commodity to man' the ‘picking' realises through three places of work. The palés of origin put on of tables elevadoras that allow an optimum adaptation of the height of work. Another highlight is the system Pick by Light. This method allows to transmit him to the preparador the articles and the quantities that have to prepare through a signal of light situated on of the compartment of where takes out the commodity. The clear advantages of the system Pick by Light consist in an increase of the performance during the process of ‘picking' and a decrease of errors in combination with a greater flexibility.
Put to disposal for the sending
A car transfer carries to the palés of sending to line of desalmacenamiento, where can be accumulated on of pending lanes. Behind each pair of lanes there are spaces to allow the access in case to have to take part manualmente when it remains atascado a palé.