Hvac installations: operating room air handling units
The key of this type of installation would be: • air treatment units.Climate control all foreign air more than 20 renewals per hour, three stages of filtration for high efficiency in the drive, and a module exhaust/Retriever.
• Independent pipeline up to the room. Galvanized steel pipes isolated by the outside network.
• Absolute filters terminals. Drive with high induction diffusers equipped with absolute filters and extraction, with control grids arranged up and down.
• Qualification of rooms. After installation are made timely testing, leak test and integrity of absolute filters, among other renovations for the classification of the room.